the layout is fixed. The consultee position is settled, the policy hooks are clear, and officers know what adequate provision looks like. The harder question for anyone bringing a site forward is what to actually put on the drawings.
This is what a scheme is expected to provide, and where the provision has to be written down to count.
What counts as active travel
Active travel covers journeys made under your own steam: on foot, by wheelchair or mobility scooter, and by bike. Wheeling sits inside the definition, which matters more than it sounds, because step-free and inclusive design is assessed on its own terms rather than folded into a general pedestrian route.
In planning, the test is whether the layout makes those journeys safe, direct and obvious enough that the car is not the only realistic option. That runs from paths and crossings inside the red line, out to how the site meets the existing network, through to the parking and facilities that make walking and cycling workable every day.
Where the requirements come from
The NPPF asks development to give priority to pedestrian and cycle movements and to make the most of sustainable transport. Active Travel England is a statutory consultee above set thresholds, which we covered in [how active travel requirements are changing the way developments get approved]([LIVE URL — confirm slug]). Local plans and design guides turn all of that into firm expectations, and LTN 1/20 is the reference point most authorities work to on cycle infrastructure.
The practical read: provision is assessed against published standards, so it can be measured. LTN 1/20 brings assessment tools with it, including Cycling Level of Service and the Junction Assessment Tool, and a scheme that has been tested against them arrives with its own evidence rather than an opinion.
Routes and crossings
Footways and cycle routes through the site should be step-free, lit and wide enough to feel safe when they are quiet. They need to connect to the network beyond the boundary rather than stopping at it, because a route that dead-ends at the red line does nothing for the trips it was meant to serve.
Crossings have to sit on the desire lines people will use. Put them where the drawing is tidy and they get walked around, which shows up quickly on site and reads badly on paper.
Cycle parking that gets used
Provision is judged on form as much as number. Location, security, weather protection, and whether the stands take cargo bikes, adapted cycles and trailers all feed into whether the spaces do anything. A count that meets the local standard but sits in an awkward basement corner satisfies a table and nothing else.
The travel plan is where it gets secured
For most sites of any size, the travel plan is where provision is committed to and where the application either holds together or comes apart.
It sets the measures, from routes and parking through to information for new residents or staff, sets the targets, and puts monitoring behind them. A travel plan naming real, deliverable measures carries far more weight than one listing intentions.
It is also where provision links back to the trip generation assumptions in the transport assessment. If the assessment claims a mode shift the layout does not support, that gap is the first thing a consultee finds.
Provision described in a transport statement but not secured through the travel plan or a condition is not provision. It is a paragraph.
Where schemes lose ground
The recurring failures are visible from outside the process. Routes that look complete on the masterplan and dead-end at the boundary. Cycle parking that hits a number in a form nobody will use. Crossings positioned for the drawing. Measures described but never secured.
Each gives a consultee something to push on, and each is avoidable by designing the active travel network in from the first layout rather than retrofitting it before submission.
How we help
We build active travel into the transport work from the first layout, set the walking and cycling provision against local policy and LTN 1/20, and carry it through the transport assessment and travel plan so the application tells one story. It is part of our transport planning and planning application support.
If you have a site coming forward, you can get in touch with the team via the London office, the Bristol office, the Cambridge office, or the Norwich office to talk through your scheme.